DEKALB COUNTY, GA— Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to-system ramps at the I-285/I-20 East Interchange and add a combination of collector-distributor (CD), or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange.
Where/When: Traffic impacts on the I-285/I-20 Interchange project from Friday, March 13,  through Friday, March 20. Â
DAYTIME CLOSURES:Â Â
Friday, March 13, through Friday, March 20, from 9 a.m. to 2 p.m.Â
- I-20 Eastbound:Â Single, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)Â
- I-20 Eastbound:Â Single, right- or left- lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)Â Â Â
- I-20 Eastbound:Â Single, right- or left-lane and shoulder closure from Panola Road (MM 71.4) to Fairington Road (MM 72.8) Â Â
Friday, March 13, through Friday, March 20, from 9 a.m. to 4 p.m.Â
- Hillandale Drive at DeKalb Medical Parkway
Flagging Operation
Friday, March 13, through Friday, March 20, from 9 a.m. to 4 p.m.Â
Flagging OperationÂ
Friday, March 13, through Friday, March 20, from 9 a.m. to 4 p.m. Â
- Chupp Way at Fairington Road
Flagging OperationÂ
OVERNIGHT CLOSURES AND TRAFFIC PACING:Â
Friday, March 13, through Friday, March 20, from 7Â p.m. to 5 a.m. Â Â
- I-20 Eastbound:Â Single to double, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)Â Â
- I-20 Eastbound (connecting lanes or CD lanes): Single to double, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5) Â
- I-20 Eastbound:Â Single to double, right- or left-lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
- I-20 Eastbound to I-285 Northbound single to double right or left lane, left-and right lane closure
- I-20 Eastbound:Â single right lane closure on Wesley Chapel off ramp
- I-20 Eastbound: Single to double, right or left-lane closure from Panola Road (MM 71.3)to Fairington Road OverpassÂ
Friday, March 13, through Friday, March 20, from 8 p.m. to 5 a.m.Â
- I-285 Southbound: single to double left or right lane closure from Interchange to Columbia Drive Â
- I-285 Southbound: single to double right lane and shoulder closures from Glenwood to Interchange Â
- I-285 Northbound: Single to double left, or right lanes and shoulder closure from Columbia to Interchange Â
- I-285 Northbound: Single to double left, or right lanes and shoulder closure from Interchange to Glenwood Â
Friday, March 13, through Friday, March 20, from 9 p.m. to 5 a.m.Â
- I-20 Westbound:Â Single to double, left-lane closure from Wesley Chapel Road (MM 69.5) to Columbia Drive (MM 66.8)Â Â
- I-20 Westbound:Â Alternating, single, left- and right-lane and shoulder closure from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)Â
- I-20 Westbound: Single to double, right or left-lane closure from Fairington Road Overpass to Panola Road (MM 71.3)Â Â
Wednesday, March 18, through Friday, March 20, from 9 p.m. to 5 a.m
-  I-20 Eastbound from the Snapfinger Creek bridge to the Fairington Rd overpass – Traffic Shift

Post Views: 431




